Zurich
The Baugenossenschaft für neuzeitliches Wohnen (bgnzwo) is replacing the existing 86 apartments in the Zwischenbächen complex in Zurich from the 1950s with 157 modern apartments built to a high cooperative standard. The new residential complex will be groundbreaking in terms of economic efficiency, ecology, and social sustainability.
The overall concept, with four angled building structures, frees up a maximum of open space between the houses, which will be transformed into a varied, ecologically valuable “residential park” by the planned outdoor space design.
In addition to the architectural quality requirements, the requirements of the 2000-watt society are achieved through high savings in construction and operation. In terms of building technology, the aim is to achieve an optimum level of technology with maximum energy efficiency and sustainability as well as economical operation and maintenance. Heating for the estate is provided by the ewz long-distance heating network, while general electricity is covered by photovoltaic systems on the rooftops.
The new replacement building will be constructed in two phases.
Owner
Baugenossenschaft für neuzeitliches Wohnen, Zurich
Project parties
Michael Meier und Marius Hug Architekten, Zurich
Project details
Project type: new building
Utilization: residential
Project start: 2021
Completion: 2026
Volume according to SIA 416: 82’604 m3
Floor area according to SIA BGF: 25’745 m2
Caretta Weidmann
Services: general planning, construction management, cost planning
Caretta+Weidmann
Baumanagement AG
Langgrütstrasse 112
CH-8047 Zürich
+41 44 497 61 61
Caretta+Weidmann
Baumanagement AG
Horburgstrasse 105
CH-4057 Basel
+41 61 322 32 12
Caretta+Weidmann
Baumanagement AG
Champfèr
CH-7500 St. Moritz
+41 44 497 61 61