Baugenossenschaft für neuzeitliches Wohnen (bgnzwo) is replacing the existing 86 flats in the 1950s Zwischenbächen housing estate in Zurich with 157 modern flats built to a high cooperative standard. The new residential complex will be pioneering in terms of economic efficiency, ecology and social sustainability.
The overall concept with four angled building structures maximises the open space between the houses, which will be transformed into a varied, ecologically valuable ‘residential park’ thanks to the planned outdoor space design.
In addition to the architectural quality requirements, the requirements of the 2000-watt society are achieved through high savings in construction and operation. In terms of building technology, the aim is to achieve an optimum level of technology with maximum energy efficiency and sustainability, as well as economical operation and maintenance. The district heating network of ewz will provide heating for the development, while the general electricity will be covered by photovoltaic systems on the roofs.
The new replacement building will be constructed in two phases.
Client
Building co-operative for modern living, Zurich
Project participants
Michael Meier and Marius Hug Architects, Zurich
Project details
Project type: New building
Utilisation: Residential
Project start: 2021
Completion: 2026
Volume according to SIA 416: 82’604 m3
Floor area according to SIA BGF: 25’745 m2
Caretta Weidmann
Services provided: General planning, construction management, cost planning
Caretta Weidmann
Langgrütstrasse 112
CH-8047 Zürich
+41 44 497 61 61
Caretta Weidmann
Horburgstrasse 105
CH-4057 Basel
+41 61 322 32 12
Caretta Weidmann
Hodlerstrasse 5b
CH-3011 Bern
Caretta Weidmann
Champfèr
CH-7500 St. Moritz
+41 44 497 61 61